Mining Engineering & Economics Platform
From Class 5 screening estimates to bankable BFS — copper, gold, lithium, iron ore, and critical minerals projects across 30+ countries, all AACE-compliant.
Bankable Class 3 feasibility study for a 120 ktpd open pit copper mine expansion including heap leach, SX-EW circuit upgrade, and comprehensive ESG strategy. Delivered within 8 months.
Definitive CAPEX/OPEX control estimate for 85 ktpd open pit copper mine with flotation plant, tailings storage facility, and 35 MW solar hybrid power system.
Bankable feasibility study for 5 Mtpa open pit gold mine with CIL processing circuit. Includes NI 43-101 compliant resource estimate, LOM schedule, and ESG baseline.
Pre-feasibility study for high-purity lithium carbonate production from Puna plateau brine. Covers DLE technology assessment, SOP by-product recovery, and EV battery supply chain analysis.
CAPEX/OPEX control estimate for major iron ore mine expansion including crushing, screening, rail infrastructure, and port upgrade. Scope 1/2 carbon reduction roadmap included.
Bankable feasibility study for laterite nickel-cobalt project using HPAL technology. Includes MHP refining, EV battery precursor supply chain, and IFC social performance standards.
Full Digital Twin implementation for 400 ktpa copper smelter. AI predictive maintenance reduced unplanned downtime by 22%. Energy optimization cut power consumption by 14%. ROI achieved in 8 months.
Bankable feasibility for 1.2 Mtpa underground gold mine using cut-and-fill stoping. Includes ventilation design, paste backfill plant, and JORC-compliant resource model with 3.1 Moz Au.
Comprehensive ESG strategy and GRI/TCFD reporting package that secured a $200M green loan at 40bps below market rate. Scope 1/2/3 carbon footprint assessment and Net Zero 2040 roadmap.
Bankable feasibility study for 30 ktpd heap leach copper operation with SX-EW cathode production. Estimate accuracy within 12% of final EPC contract value — exceptional Class 3 performance.
Pre-feasibility study for hard-rock lithium spodumene project with DMS and flotation processing to 6% Li₂O concentrate. Includes renewable energy integration and community engagement framework.
Class 4 pre-feasibility for direct shipping ore (DSO) nickel laterite operation. Covers mining, crushing, stockpile, and port infrastructure. Environmental permitting pathway and social impact assessment included.
Full LCOE study and CAPEX estimate for 45 MW solar PV + 20 MWh BESS hybrid power system replacing diesel generation at remote platinum mine. 35% energy cost reduction. Scope 1 emissions cut by 28%.
Join 150+ global mining companies that trust KDMine Group for precision AACE-compliant estimates, bankable feasibility studies, and ESG strategies.