Project Portfolio

150+ Global Mining Projects Delivered

From Class 5 screening estimates to bankable BFS — copper, gold, lithium, iron ore, and critical minerals projects across 30+ countries, all AACE-compliant.

150+
Total Projects
$2.4B+
Value Estimated
30+
Countries
98%
On-Time Delivery
7
Commodities
Filter by:
12 projects found
Atacama Copper
CopperOpen Pit
Completed
🇨🇱 Chile 2025 AACE Class 2

Atacama Copper Project — Class 2 Control Estimate

Definitive CAPEX/OPEX control estimate for 85 ktpd open pit copper mine with flotation plant, tailings storage facility, and 35 MW solar hybrid power system.

$850M
CAPEX
85 ktpd
Throughput
18 yrs
LOM
FlotationTSF DesignSolar HybridAACE Class 2
West Africa Gold
GoldBFS
Completed
🇬🇭 Ghana2024AACE Class 3

West African Gold BFS — CIL Processing Plant

Bankable feasibility study for 5 Mtpa open pit gold mine with CIL processing circuit. Includes NI 43-101 compliant resource estimate, LOM schedule, and ESG baseline.

$420M
CAPEX
5 Mtpa
Throughput
12 yrs
LOM
CILNI 43-101LOM ScheduleESG Baseline
Lithium Brine
LithiumCritical Mineral
Ongoing
🇦🇷 Argentina2025AACE Class 4

Puna Lithium Brine — Pre-Feasibility Study

Pre-feasibility study for high-purity lithium carbonate production from Puna plateau brine. Covers DLE technology assessment, SOP by-product recovery, and EV battery supply chain analysis.

$680M
CAPEX
25 ktpa
LCE Output
20 yrs
LOM
DLE TechnologyBrineEV BatteryIEA 2025
Iron Ore
Iron OreExpansion
Completed
🇦🇺 Australia2024AACE Class 2

Pilbara Iron Ore Expansion — 240 Mtpa

CAPEX/OPEX control estimate for major iron ore mine expansion including crushing, screening, rail infrastructure, and port upgrade. Scope 1/2 carbon reduction roadmap included.

$1.1B
CAPEX
240 Mtpa
Throughput
30 yrs
LOM
CrushingRail InfraPort UpgradeNet Zero
Nickel HPAL
NickelHPAL
In Study
🇮🇩 Indonesia2025AACE Class 3

Sulawesi Nickel-Cobalt HPAL — Bankable BFS

Bankable feasibility study for laterite nickel-cobalt project using HPAL technology. Includes MHP refining, EV battery precursor supply chain, and IFC social performance standards.

$920M
CAPEX
40 ktpa
Ni Output
22 yrs
LOM
HPALMHPEV BatteryIFC Standards
Digital Twin
Digital TwinAI/ML
Completed
🇮🇷 Iran2025Digital

AI Digital Twin — Copper Smelter OPEX Reduction

Full Digital Twin implementation for 400 ktpa copper smelter. AI predictive maintenance reduced unplanned downtime by 22%. Energy optimization cut power consumption by 14%. ROI achieved in 8 months.

22%
Downtime ↓
14%
Energy ↓
8 mo
ROI
Digital TwinAI/MLPredictive Maint.SCADA
Underground Gold
GoldUnderground
Completed
Underground Gold
GoldUnderground
Completed
🇰🇿 Kazakhstan2023AACE Class 3

Altai Underground Gold — Cut & Fill BFS

Bankable feasibility for 1.2 Mtpa underground gold mine using cut-and-fill stoping. Includes ventilation design, paste backfill plant, and JORC-compliant resource model with 3.1 Moz Au.

$310M
CAPEX
3.1 Moz
Au Resource
15 yrs
LOM
Cut & FillJORCPaste BackfillVentilation
ESG Green Finance
ESGGreen Finance
Completed
🇨🇱 Chile2024ESG Advisory

$200M Green Loan Advisory — Net Zero Roadmap

Comprehensive ESG strategy and GRI/TCFD reporting package that secured a $200M green loan at 40bps below market rate. Scope 1/2/3 carbon footprint assessment and Net Zero 2040 roadmap.

$200M
Green Loan
40bps
Below Market
2040
Net Zero
GRI/TCFDScope 1/2/3Net ZeroIFC Standards
Heap Leach
CopperHeap Leach
Completed
🇮🇷 Iran2023AACE Class 3

Kerman Copper Heap Leach — SX-EW BFS

Bankable feasibility study for 30 ktpd heap leach copper operation with SX-EW cathode production. Estimate accuracy within 12% of final EPC contract value — exceptional Class 3 performance.

$290M
CAPEX
30 ktpd
Throughput
±12%
Accuracy
Heap LeachSX-EWCathodeAACE Class 3
Lithium Spodumene
LithiumSpodumene
In Study
🇧🇷 Brazil2025AACE Class 4

Minas Gerais Spodumene — Pre-Feasibility

Pre-feasibility study for hard-rock lithium spodumene project with DMS and flotation processing to 6% Li₂O concentrate. Includes renewable energy integration and community engagement framework.

$540M
CAPEX
3 Mtpa
Throughput
18 yrs
LOM
SpodumeneDMSFlotationRenewable Energy
Nickel Laterite
NickelLaterite
Completed
🇵🇭 Philippines2024AACE Class 4

Palawan Nickel Laterite — DSO Screening Study

Class 4 pre-feasibility for direct shipping ore (DSO) nickel laterite operation. Covers mining, crushing, stockpile, and port infrastructure. Environmental permitting pathway and social impact assessment included.

$180M
CAPEX
5 Mtpa
DSO Output
10 yrs
LOM
DSOLateritePort InfraEIA
Solar Mine Power
RenewableSolar/BESS
Completed
🇿🇦 South Africa2025Energy Study

Limpopo Mine Solar-BESS Hybrid — 45 MW

Full LCOE study and CAPEX estimate for 45 MW solar PV + 20 MWh BESS hybrid power system replacing diesel generation at remote platinum mine. 35% energy cost reduction. Scope 1 emissions cut by 28%.

$95M
CAPEX
35%
Energy Saving
28%
CO₂ Reduction
Solar PVBESSLCOEScope 1 Reduction
Start Your Project

Ready to Add Your Project to Our Portfolio?

Join 150+ global mining companies that trust KDMine Group for precision AACE-compliant estimates, bankable feasibility studies, and ESG strategies.