Proven Results, Real Impact

Explore how we've helped mining companies worldwide achieve significant cost savings, efficiency improvements, and operational excellence through data-driven consulting.

$47M+
Total Cost Savings
23%
Avg. Efficiency Gain
100+
Projects Completed
98%
Client Satisfaction
FEATURED
COST REDUCTION • EQUIPMENT OPTIMIZATION

Rio Mining Saves $2.4M Through Fleet Optimization

Rio Mining Corporation • Chile

Comprehensive haul truck fleet analysis and replacement strategy reduced operating costs by 18% while improving productivity by 22% at a major copper operation.

$2.4M
Annual Savings
18%
Cost Reduction
22%
Productivity Gain

Challenge

Rio Mining operated a mixed fleet of 45 haul trucks (Caterpillar 793F and Komatsu 930E) with escalating maintenance costs and declining availability. The mine faced:

  • Average truck age of 12 years with 35,000+ operating hours
  • Mechanical availability dropped from 87% to 71% over 3 years
  • Maintenance costs increased 45% year-over-year
  • Production targets missed by 12% due to equipment downtime
  • Fuel consumption 15% above industry benchmarks

Our Approach

Kavian deployed a 4-person team for a comprehensive 8-week analysis:

Data Collection

3 years historical data

Fleet Analysis

Lifecycle cost modeling

Optimization

Replacement strategy

Procurement

Vendor negotiations

We analyzed maintenance records, fuel consumption, production data, and conducted time studies. Our proprietary AI model predicted optimal replacement timing for each unit.

Solution Implemented

  • Phase 1 (Year 1): Replace 12 oldest trucks with new Caterpillar 794 AC units
  • Phase 2 (Year 2): Major component rebuilds on 18 mid-life trucks
  • Phase 3 (Year 3): Retire remaining 15 oldest units, standardize on Cat 794 platform
  • Implemented predictive maintenance program using telematics data
  • Negotiated fleet purchase agreement saving $3.2M vs. list pricing
  • Established parts inventory optimization reducing carrying costs by $450K

Key Innovation: Our AI-powered lifecycle cost model analyzed 127 variables to determine optimal replacement timing, achieving 94% prediction accuracy compared to actual outcomes.

Results & Impact

After 18 months of implementation:

  • $2.4M annual cost savings (18% reduction in total fleet operating costs)
  • Fleet mechanical availability increased from 71% to 89%
  • Maintenance costs per operating hour reduced by 32%
  • Fuel consumption improved 12% through newer, more efficient engines
  • Production exceeded targets by 8% due to improved availability
  • Safety incidents reduced 35% with newer equipment and better training

"Kavian's analysis was incredibly thorough. They didn't just recommend new trucks - they provided a complete roadmap with financial modeling, implementation timeline, and ongoing support. The results exceeded our expectations."

JM
Juan Martinez
VP of Operations, Rio Mining Corporation
FEASIBILITY STUDY • COST ANALYSIS

Gold Project Feasibility Unlocks $180M Investment

Aurelia Resources • Australia

Comprehensive Class 2 feasibility study for a 2.5 Mtpa gold processing plant enabled project financing and reduced estimated CAPEX by $22M through equipment optimization.

$180M
Financing Secured
$22M
CAPEX Reduction
±12%
Estimate Accuracy

Challenge

Aurelia Resources needed a bankable feasibility study to secure financing for their greenfield gold project in Western Australia. Previous consultant estimates varied by 35%, creating uncertainty for investors.

Our Solution

12-week comprehensive study following AACE Class 2 standards (±10-15% accuracy):

  • Detailed equipment selection for crushing, grinding, CIL circuit, and tailings
  • CAPEX estimate: $156M (vs. previous $178M estimate)
  • OPEX estimate: $42/tonne processed with detailed breakdown
  • NPV analysis showing 18.5% IRR at $1,800/oz gold price
  • Sensitivity analysis on key variables (gold price, recovery, throughput)

Results

  • Secured $180M project financing from consortium of banks
  • Reduced CAPEX by $22M through optimized equipment selection
  • Project construction completed on time and 3% under budget
  • Actual OPEX within 8% of our estimate after first year

"The level of detail in Kavian's feasibility study gave our investors complete confidence. Their equipment expertise and cost database were invaluable in securing financing."

ST
Sarah Thompson
CEO, Aurelia Resources
INTERNATIONAL PROCUREMENT

Copper Mine Saves $8.5M on Crusher Procurement

Andean Copper Ltd. • Peru

Strategic procurement of primary gyratory crusher and secondary cone crushers through competitive bidding and technical evaluation saved 24% vs. initial quotes.

$8.5M
Cost Savings
24%
Below Initial Quote
5
Vendors Evaluated

Challenge

Andean Copper needed to replace aging crushing equipment but received a single quote of $35.5M from their incumbent supplier. They sought competitive alternatives without compromising quality or delivery.

Our Approach

  • Developed detailed technical specifications and performance requirements
  • Invited bids from 5 qualified manufacturers (Metso, FLSmidth, Sandvik, ThyssenKrupp, CITIC)
  • Conducted technical evaluation scoring system (40% technical, 30% commercial, 30% delivery)
  • Negotiated terms including performance guarantees and payment schedules
  • Managed logistics, customs clearance, and installation supervision

Results

  • Final contract: $27.0M with FLSmidth (24% savings vs. initial quote)
  • Equipment delivered on schedule with performance guarantees met
  • Crusher throughput 8% above nameplate capacity in first year
  • Established framework for future competitive procurement

"Kavian's procurement expertise and vendor relationships saved us millions. Their technical evaluation ensured we got the best value, not just the lowest price."

CR
Carlos Rodriguez
Chief Engineer, Andean Copper Ltd.
Ready to Achieve Similar Results?

Let's discuss how our proven methodologies can optimize your mining operations and deliver measurable cost savings.

Schedule a Consultation