Equipment selection is one of the most critical decisions in mining project development. The right equipment can significantly impact operational efficiency, production capacity, and overall project economics. Our equipment selection service provides comprehensive analysis and recommendations to ensure you choose the optimal equipment for your specific application.

We consider multiple factors including ore characteristics, throughput requirements, energy efficiency, maintenance requirements, capital costs, and operating costs. Our team has extensive experience with all major equipment manufacturers and can provide unbiased recommendations based on your specific needs.

Key Features

📊

Capacity Analysis

Detailed equipment sizing calculations based on throughput requirements and ore characteristics.

💰

Cost Comparison

Comprehensive CAPEX and OPEX analysis for different equipment options.

🏭

Vendor Evaluation

Objective assessment of equipment suppliers based on quality, reliability, and support.

Energy Efficiency

Analysis of power consumption and recommendations for energy-efficient solutions.

🔧

Maintenance Planning

Evaluation of maintenance requirements and spare parts availability.

📈

Performance Prediction

Simulation and modeling to predict equipment performance under various conditions.

Our Process

1

Requirements Analysis

We begin by thoroughly understanding your project requirements, including production targets, ore characteristics, site conditions, and budget constraints.

2

Equipment Sizing

Using industry-standard calculation methods and our proprietary tools, we determine the optimal equipment sizes for your application.

3

Options Evaluation

We evaluate multiple equipment options from different manufacturers, comparing technical specifications, costs, and performance characteristics.

4

Recommendation Report

We deliver a comprehensive report with our recommendations, including technical justification, cost analysis, and implementation considerations.

Case Study: Sarcheshmeh Copper Concentrator

We provided comprehensive equipment selection services for a 50,000 TPD copper concentrator project. Our recommendations resulted in 15% lower capital costs compared to the initial design while maintaining the same production capacity and recovery rates.

50K
TPD Capacity
15%
Cost Savings
$85M
Project Value
12
Months Duration